Question:

Required budget for story and script, producer, director and lead performers is considered in the

Show Hint

To remember this division: Above-the-Line costs are for the intellectual and creative leaders of the project, while Below-the-Line covers the day-to-day technical and physical execution of the shoot.
Updated On: Jun 29, 2026
  • Below the line cost
  • Above the line cost
  • Contingency
  • Both (A) and (C)
Show Solution
collegedunia
Verified By Collegedunia

The Correct Option is B

Solution and Explanation



Step 1: Understanding Film Budgeting Categories:

Film budgets are divided into Above-the-Line (ATL) and Below-the-Line (BTL) costs.

Step 2: Analyzing Above-the-Line (ATL):

ATL includes the fees associated with the key creative development team (rights to the script, producer, director, and star actors). These are negotiated upfront and do not scale with the shooting days.

Step 3: Evaluating other Options:

BTL costs are physical operational costs (catering, equipment, crew wages). Contingency is an emergency reserve. Since story and lead talent are developmental intellectual elements, they belong strictly to ATL costs.
Was this answer helpful?
0
0