| (A) | 8.94 kWh |
| (B) | 120 kWh |
| (C) | 12 hPh |
| (D) | 240 hPh |
| (A) | Irrigation Water Lifting |
| (B) | Winnowing |
| (C) | Threshing |
| (D) | Harvesting |
| (E) | Cultivation |
| (F) | Transportation |
| (A) | Use of Infiltrometer |
| (B) | Measurement of subsidence of free water in a large basin |
| (C) | Estimation of accumulated infiltration from water front advance data |
| List-I | List-II |
| (A) Falling rate period | (I) Ratio of humidity with respect to humidity at saturation point |
| (B) Absolute humidity | (II) Critical moisture content |
| (C) Percent humidity | (III) Equilibrium moisture content |
| (D) Constant rate period | (IV) Ratio of kg of water vapour in kg of dry air |