Given indoor temperature range 38°C (max) and 34°C (min) and outdoor range 42°C and 30°C, the thermal damping (in %) is \(\underline{\hspace{2cm}}\).
GATE AR - 2022
GATE AR
Building Services and Sustainability
Thermal, visual and acoustic comfort in built environments
For a masonry section of width 600 mm with zero tensile strength and a linear stress–strain response, the minimum eccentricity (in mm) at which cracking begins is \(\underline{\hspace{2cm}}\).
GATE AR - 2022
GATE AR
Building Construction and Structural systems
Principles of strength of materials
As per the
Handbook of Professional Documents 2015
, Council of Architecture, India, architects are liable \(\underline{\hspace{2cm}}\).
GATE AR - 2022
GATE AR
Construction and Management
Professional practice and ethics
Which of the following help(s) in keeping
direct solar radiation
out of the building?
GATE AR - 2022
GATE AR
Building Services and Sustainability
Climate responsive design
Which of the following sites were added to the
Ramsar List
in the year 2020?
GATE AR - 2022
GATE AR
Environmental Planning and Design
Natural and man-made ecosystem
Hogarth's
Line of Beauty
is a \(\underline{\hspace{2cm}}\).
GATE AR - 2022
GATE AR
History and Contemporary Architecture
Principles of Art and Architecture
The
Golden Ratio
refers to \(\underline{\hspace{3cm}}\).
GATE AR - 2022
GATE AR
Architecture, Planning and Design
Universal design
The following two-dimensional visual composition represents \(\underline{\hspace{3cm}}\).
GATE AR - 2022
GATE AR
Architecture, Planning and Design
Visual composition in 2D and 3D
Arrange the following road types in
descending order
of accessibility.
(P) Arterial Road
(Q) Expressway
(R) Collector Road
(S) Local Street
GATE AR - 2022
GATE AR
Infrastructure Planning
Hierarchy of roads and level of service
Which of the following is the
National Electronic Toll Collection
System implemented by the National Payment Corporation of India?
GATE AR - 2022
GATE AR
Infrastructure Planning
Intelligent Transportation Systems
Which of the following is/are
Value Capture Method(s)
?
GATE AR - 2022
GATE AR
Planning Techniques and Management
Urban Economics
Which among the following is/are model(s) of
Public-Private Partnership
(PPP) used for infrastructure projects?
GATE AR - 2022
GATE AR
Planning Techniques and Management
Planning Legislation and implementation – Land Acquisition Act, PPP etc.
Which of the following is/are example(s) of Tomb Architecture of Ancient Egypt?
GATE AR - 2022
GATE AR
History and Contemporary Architecture
History of Architecture
Which of the following processes is used for
surface treatment of metals
?
GATE AR - 2022
GATE AR
Building Construction and Structural systems
Building material characteristics and applications
Among the following monuments of ancient Greece, the only
Octastyle Peripteral temple with eight towering Doric columns lining both east and west facades
is \(\underline{\hspace{3cm}}\).
GATE AR - 2022
GATE AR
History and Contemporary Architecture
History of Architecture
An Ultrasonic Pulse Velocity (UPV) test was done on a hardened concrete element using direct transmission method as per IS 516 (Part 5/Section 1): 2018. The distance between the transducer and receiver is 600 mm. The time taken for the induced wave to travel this distance is 0.18 milliseconds. Based on the following Table, the concrete quality grading is \(\underline{\hspace{2cm}}\).
\[\begin{array}{|c|c|} \hline \textbf{Velocity (km/s) – cross probing} & \textbf{Concrete quality grading} \\ \hline \text{Above 4.4} & \text{Excellent} \\ \hline \hline \text{3.75 – 4.4} & \text{Good} \\ \hline \hline \text{3.0 – 3.75} & \text{Doubtful} \\ \hline \hline \text{Less than 3.0} & \text{Poor} \\ \hline \end{array}\]
GATE AR - 2022
GATE AR
Building Construction and Structural systems
Building material characteristics and applications
As per the URDPFI Guidelines 2015, which of the following Organoleptic and Physical parameters comply with the acceptable limit requirements of
drinking water quality
?
GATE AR - 2022
GATE AR
Services and Infrastructure
Water treatment and Methods
In traditional Persian context,
qanat
system refers to
GATE AR - 2022
GATE AR
Services and Infrastructure
Water supply and distribution system
Which of the following is/are classified as the
Principles of Universal Design
?
GATE AR - 2022
GATE AR
Architecture, Planning and Design
Universal design
A building site measures 96 sq.cm on a scale of 1:12500. The
actual area
it represents (in hectare, in integer) is \(\underline{\hspace{1cm}}\).
GATE AR - 2022
GATE AR
Architecture, Planning and Design
Architectural Graphics
The correct sequence of the following
Construction Project Development stages
, as per the National Building Code of India 2016 is \(\underline{\hspace{2cm}}\).
(P) Resource Planning
(Q) Project Inception
(R) Commissioning and Handing over
(S) Tendering
(T) Site Survey and Soil Investigation
(U) Selection of Construction Methodology
GATE AR - 2022
GATE AR
Construction and Management
Project management techniques e.g. PERT, CPM etc.
As per the United Nations
Transforming our world: The 2030 agenda for sustainable development
(2015), which of the following Sustainable Development Goals (SDGs)
directly address
water-related issues?
GATE AR - 2022
GATE AR
Environmental Planning and Design
Sustainable development, goals and strategies
The
concentric circles
in a sun-path diagram represent \(\underline{\hspace{2cm}}\).
GATE AR - 2022
GATE AR
Building Services and Sustainability
Solar architecture
The operational guidelines on Credit Linked Subsidy Scheme (CLSS) for EWS, January 2017, define EWS households as those having an annual income up to \(\underline{\hspace{2cm}}\) (in Indian Rupees).
GATE AR - 2022
GATE AR
Housing
Affordable Housing
Which of the following is a
Vector Graphics Software
?
GATE AR - 2022
GATE AR
Architecture, Planning and Design
Computer application in Architecture and Planning
Prev
1
...
5236
5237
5238
5239
5240
...
8959
Next