Step 1: Understanding the Concept:
A sprinkler irrigation system applies water in a manner simulating natural rainfall.
To ensure safe, clog-free, and efficient operation (especially when practicing fertigation), the components of the system must be connected in a specific, logically designed sequence.
Step 2: Detailed Explanation:
Let us trace the correct flow of water through the sprinkler system components:
1. Pump: Draws water from the source and pressurizes it.
2. Course Filter (Primary Filtration): Placed immediately after the pump to trap large sand, silt, and organic debris.
3. Fine Filter (Secondary Filtration): Screens out remaining fine particles to prevent clogging.
4. Fertilizer Tank (Fertigation): Placed after the filtration system (or in a parallel bypass setup) so that dissolved fertilizers are introduced into the clean water stream.
5. Main Line: Carries the pressurized, filtered water (and dissolved fertilizers) from the head unit to the sub-mains or directly to the field.
6. Laterals: Smaller pipes branching off the main line, laid out across the crop rows (groundnut field) to distribute water closer to the plants.
7. Risers: Vertical pipes connected to the laterals at regular intervals to raise the sprinkler heads above the crop canopy.
8. Sprinklers (Nozzles): Mounted on top of the risers, these rotate and spray water as fine droplets over the field.
Comparing this sequence with the options:
Sequence (A) perfectly represents the correct, standard engineering layout.
Therefore, only sequence (A) is correct.
Step 3: Final Answer:
The correct option is (D).