To solve this problem, we need to analyze the given data and constraints about the ratings of the eight employees:
Combining these, notice that:
The sum of all ratings calculated from the five highest and lowest ratings is 190 + 125 = 315.
However, we know the sum from the average calculation should be 240. This indicates an overlap of exactly two ratings between the highest and lowest groups (i.e., 315 - 240 = 75).
Now, let's analyze the options:
Therefore, the statement that is definitely false is: The third lowest rating obtained is 37.


| Variable Cost Estimates of Mulchand Textiles | ||
|---|---|---|
| Output (Square feet) | Labour cost (Rs.) | Material cost (Rs.) |
| 25000 | 21500 | 11050 |
| 50000 | 41500 | 22000 |
| 75000 | 60000 | 33000 |
| 100000 | 78000 | 44000 |
| 125000 | 95000 | 54750 |
| 150000 | 111000 | 65700 |
| 175000 | 133000 | 76650 |
| 200000 | 160000 | 88000 |