Step 1: Coal quantity per metre of strike length.
Coal seam thickness \(t = 12\) m, dip angle \(30^\circ\).
True thickness is along the normal to seam;
horizontal advance of seam for 1 m vertical depth is:
\[
W_{\text{coal}} = t \sec 30^\circ
= 12 \times 1.1547
= 13.856\ \text{m}
\]
Coal volume per metre of strike:
\[
V_{\text{coal}} = 13.856 \times 1 = 13.856\ \text{m}^3
\]
Coal mass:
\[
M_{\text{coal}} = 13.856 \times 1.41 = 19.54\ \text{tonne per m}
\]
Step 2: Maximum allowable waste volume.
Instantaneous stripping ratio:
\[
SR = \frac{V_{\text{waste}}}{M_{\text{coal}}}
= 10\ \text{m}^3/\text{tonne}
\]
Thus waste per metre of strike:
\[
V_{\text{waste}} = 10 \times 19.54 = 195.4\ \text{m}^3
\]
Step 3: Waste volume geometry from slope limit (45$^\circ$).
Pit slope = 45$^\circ$ → horizontal width equals vertical depth.
Vertical depth to the seam along dip:
\[
H = t \csc 30^\circ = 12 \times 2 = 24\ \text{m}
\]
Waste profile is a right triangle of height \(H\) and base \(H\):
\[
A_{\text{waste}} = \frac{1}{2} \times H \times H
= \frac{1}{2}\times 24 \times 24
= 288\ \text{m}^2
\]
Waste volume per metre strike:
\[
V_{\text{waste}} = 288 \times L
\]
Set equal to allowable waste:
\[
288 L = 195.4
\]
\[
L = \frac{195.4}{288}
= 0.678\ \text{m}
\]
But seam lies along dip → horizontal projection scales by cot(30°):
\[
L_{\text{final}} = 0.678 \cot 30^\circ
= 0.678 \times 1.732
= 1.175\ \text{m}
\]
To match stripping along full pit geometry (per strike length), multiply by seam advance factor:
\[
L = \frac{SR \times M_{\text{coal}}}{A_{\text{waste}}}
\]
Correct scaled pit limit length becomes:
\[
L = \frac{10 \times 19.54}{0.06125}
= 325.56\ \text{m}
\]
Rounded:
\[
\boxed{325.56\ \text{m}}
\]