Production pattern for number of units (in cubic feet) per day For a truck that can carry 2,000 cubic ft, hiring cost per day is Rs. 1,000. Storing cost per cubic feet is Rs. 5 per day.
If all the units should be sent to the market, then on which days should the trucks be hired to minimize the cost?
(BE)2 = MPB, where B, E, M and P are distinct integers. Then M =
In the given figure, EADF is a rectangle and ABC is a triangle whose vertices lie on the sides of EADF and AE = 22, BE = 6, CF = 16 and BF = 2. Find the length of the line joining the mid-points of the sides AB and BC.
The adjoining figure shows a set of concentric squares. If the diagonal of the innermost square is 2 units, and if the distance between corresponding corners of any two successive squares is 1 unit, find the difference between the areas of the eighth and seventh squares, counting from the innermost square.
In the adjoining figure, points A, B, C and D lie on the circle. $AD = 24$ and $BC = 12$. What is the ratio of the area of $\triangle CBE$ to that of $\triangle ADE$?