Question:

There's a lot of work in preparing a birthday dinner. Even after the turkey is in the oven, there's still the potatoes and gravy, yams, salad, and cranberries, not to mention setting the table. Three friends — Asit, Arnold and Afzal — work together to get all of these chores done. The time it takes them to do the work together is 6 hr less than Asit would have taken working alone, 1 hr less than Arnold would have taken alone, and half the time Afzal would have taken working alone. How long did it take them to do these chores working together?

Show Hint

Let the time together be \(T\) hours; then the individual times are \(T+6\), \(T+1\) and \(2T\). Add the three rates and set the sum equal to \(1/T\).
Updated On: Nov 4, 2026
  • 20 min
  • 30 min
  • 40 min
  • 50 min
Show Solution
collegedunia
Verified By Collegedunia

The Correct Option is C

Solution and Explanation

Step 1: Let the time together be \(T\) hours.
Asit alone takes \(T+6\), Arnold alone takes \(T+1\), Afzal alone takes \(2T\).

Step 2: Add the work rates.
\[\frac{1}{T+6}+\frac{1}{T+1}+\frac{1}{2T}=\frac{1}{T}\]Subtract \(\frac{1}{2T}\) from both sides:
\[\frac{1}{T+6}+\frac{1}{T+1}=\frac{1}{2T}\]Step 3: Solve.
\[\frac{2T+7}{(T+6)(T+1)}=\frac{1}{2T}\Rightarrow 2T(2T+7)=T^2+7T+6\Rightarrow 3T^2+7T-6=0\]\[(3T-2)(T+3)=0\Rightarrow T=\tfrac23\ \text{hr}\ (\text{rejecting } T=-3)\]Step 4: Convert.
\(T=\frac23\) hr \(=40\) minutes.

Final Answer:
The correct option is (3): 40 min.
Was this answer helpful?
0
0

Top CAT Quantitative Aptitude Questions

View More Questions

Top CAT Time and Work Questions

View More Questions