Consider the network diagram shown in Figure. The time estimates in days along the arrows represents the activities. The project completion time in days based on critical path is

The force acting at a point \( A \) is shown in the figure. The equivalent force system acting at point \( B \) is:
A uniform rod AB is in equilibrium when resting on a smooth groove, the walls of which are at right angles to each other as shown in the figure. What is the relation between \( \theta \) and \( \phi \) in degrees?
The supply voltage magnitude \( |V| \) of the circuit shown below is ____ .
A two-port network is defined by the relation
\(\text{I}_1 = 5V_1 + 3V_2 \)
\(\text{I}_2 = 2V_1 - 7V_2 \)