Step 1: Calculate the total number of picks inserted per shift.
Loom speed = 200 picks/min.
Shift duration = 8 hours = \( 8 \times 60 = 480 \) minutes.
Efficiency = 90% = 0.90.
Total picks inserted = (Loom speed) \( \times \) (Shift duration) \( \times \) (Efficiency)
Total picks inserted = \( 200 \, \text{picks/min} \times 480 \, \text{min} \times 0.90 = 86,400 \) picks.
Step 2: Calculate the length of cloth produced in inches.
Picks per inch = 56.
Length in inches = Total picks inserted / Picks per inch
Length in inches = \( \frac{86,400}{56} \approx 1542.86 \) inches.
Step 3: Convert the length from inches to yards.
There are 36 inches in a yard.
Length in yards = Length in inches / 36
Length in yards = \( \frac{1542.86}{36} \approx 42.857 \) yards.
Step 4: Match the result with the options. The calculated production is approximately 42.86 yards, which corresponds to option (D).
In the slasher sizing machine, the principle involved in drying the wet warp sheet by physical contact with a hot drum surface is \(\underline{\hspace{2cm}}\)