Arrange the steps of Prismatic compass survey in order of execution. .A. Prepare a sketch showing the objects B. Read the bearings from both ends of the baseline, measure the length of the baseline and record them in the field book. C. A baseline is selected. D. Plot the recorded data in the field book. Choose the correct answer from the options given below: