Question:

Arrange the following critical growth stages of wheat in the order :
A. Crown root initiation stage
B. Dough stage
C. Milk stage
D. Flowering stage
E. Boot stage
Choose the correct answer from the options given below :

Show Hint

Wheat Irrigate Stages Timeline: 1. CRI (21 DAS) 2. Tillering (40--45 DAS) 3. Jointing (60 DAS) 4. Flowering (80--85 DAS) 5. Milking (100 DAS) 6. Dough (115 DAS)
Updated On: Jul 28, 2026
  • A, B, C, D, E
  • A, E, D, C, B
  • A, B, E, D, C
  • A, E, D, B, C
Show Solution
collegedunia
Verified By Collegedunia

The Correct Option is B

Solution and Explanation

Step 1: Understanding the Question:
The question requires arranging the phenological critical growth stages of wheat (Triticum aestivum) in chronological sequential order from germition to maturity.

Step 2: Sequential Phenological Stages of Wheat:


Crown Root Initiation (CRI) Stage [A]: Occurs around 21 days after sowing (DAS). Most critical irrigation stage.
Tillering Stage: 20--45 DAS.
Jointing Stage: 45--60 DAS.
Boot Stage [E]: 60--70 DAS (swelling of flag leaf sheath containing emerging spike).
Flowering Anthesis Stage [D]: 70--85 DAS.
Milking Stage [C]: 90--100 DAS (kernel content is liquid/milky).
Dough Stage [B]: 105--115 DAS (kernel converts from soft to hard dough).

Step 3: Detailed Explation:


• Matching the chronological sequence of given stages:
• First: Crown Root Initiation (A)
• Second: Boot stage (E)
• Third: Flowering stage (D)
• Fourth: Milk stage (C)
• Fifth: Dough stage (B)
• Therefore, the correct chronological sequence is A, E, D, C, B.

Step 4: Fil Answer:

The correct order is A, E, D, C, B, corresponding to option (B).
Was this answer helpful?
0
0

Top CUET PG Agroforestry Questions

View More Questions

Top CUET PG Farming, System of Crop Intensification, Organic Farming Questions

View More Questions