The base CPI for X1 is 1. The number of cycles required for X1 depends on the number of branch instructions. Since 30% of the instructions are branch instructions, and there are 2 cycles of stalls for every branch: \[ \text{CPI}_{\text{X1}} = 1 + 0.3 \times 2 = 1 + 0.6 = 1.6. \] The clock frequency for both processors is 2 GHz, so the clock cycle time is: \[ \text{Clock cycle time} = \frac{1}{\text{Clock frequency}} = \frac{1}{2 \times 10^9} = 0.5 \, \text{ns}. \] Now, consider processor X2. The base CPI remains 1, but the branch predictor eliminates stalls for correctly predicted branches. Since the predictor has 80% accuracy, the number of cycles saved for correctly predicted branches is: \[ \text{CPI}_{\text{X2}} = 1 + 0.3 \times 0.2 \times 2 = 1 + 0.12 = 1.12. \] The speedup is the ratio of the CPI for X1 to the CPI for X2: \[ \text{Speedup} = \frac{\text{CPI}_{\text{X1}}}{\text{CPI}_{\text{X2}}} = \frac{1.6}{1.12} \approx 1.43. \] Thus, the speedup obtained by X2 over X1 is: \[ \boxed{1.43}. \]
The major difficulties that cause the instruction pipeline to deviate from its normal operation are:
(A) Resource conflicts
(B) Stack operation
(C) Data dependency
(D) Branch difficulties
from the options given below: Choose the correct answer from the options given below: