Exams
>
Structural Engineering
>
Construction Management
>
the table shows the activities and their durations
Question:
The table shows the activities and their durations and dependencies in a project.
Activity
Duration (Days)
Depends on
A
8
-
B
4
A
C
4
B
D
4
C, L
F
4
A
G
4
F
H
6
G, L
K
10
A
L
6
F, K
The total duration (in days) of the project is ______ (in integer).
GATE CE - 2024
GATE CE
Updated On:
Feb 3, 2026
Show Solution
Verified By Collegedunia
Correct Answer:
30
Solution and Explanation
The correct answer is 30.
Download Solution in PDF
Was this answer helpful?
0
3
Top GATE CE Structural Engineering Questions
Concrete of characteristic strength 30 MPa is required. If 40 specimens of concrete cubes are to be tested, the minimum number of specimens having at least 30 MPa strength should be
GATE CE - 2024
Structural Engineering
Concrete
View Solution
Consider the statements P and Q.
P: Client's Preliminary Estimate is used for budgeting costs toward the end of planning and design phase.
Q: Client's Detailed Estimate is used for controlling costs during the execution of the project.
Which one of the following options is CORRECT?
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
The following figure shows the arrangement of formwork for casting a cantilever RC beam.
The correct sequence of removing the Shores/Props is:
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
The elements that DO NOT increase the strength of structural steel are
GATE CE - 2024
Structural Engineering
Construction Materials
View Solution
Consider a balanced doubly-reinforced concrete section. If the material and other sectional properties remain unchanged, for which of the following cases will the section becomes under-reinforced?
GATE CE - 2024
Structural Engineering
Working stress and Limit state design concepts
View Solution
View More Questions
Top GATE CE Construction Management Questions
Consider the statements P and Q.
P: Client's Preliminary Estimate is used for budgeting costs toward the end of planning and design phase.
Q: Client's Detailed Estimate is used for controlling costs during the execution of the project.
Which one of the following options is CORRECT?
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
The following figure shows the arrangement of formwork for casting a cantilever RC beam.
The correct sequence of removing the Shores/Props is:
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
The initial cost of an equipment is Rs. 1,00,000. Its salvage value at the end of accounting life of 5 years is Rs. 10,000. The difference in depreciation (in Rs.) computed using 'double-declining balance method' and 'straight line method' of depreciation in Year-2 is ____ (in positive integer).
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
Consider the statements P and Q.
P : In a Pure project organization, the project manager maintains complete authority and has maximum control over the project.
Q : A Matrix organization structure facilitates quick response to changes, conflicts, and project needs.
Which one of the following options is CORRECT ?
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
Consider the following data for a project of 300 days duration.
Budgeted Cost of Work Scheduled (BCWS) = Rs. 200
Budgeted Cost of Work Performed (BCWP) = Rs. 150
Actual Cost of Work Performed (ACWP) = Rs. 190
The 'schedule variance' for the project is
GATE CE - 2024
Structural Engineering
Construction Management
View Solution
View More Questions
Top GATE CE Questions
If
\(1+\frac{1}{2}+\frac{1}{3}+\frac{1}{4}+\frac{1}{5}+\frac{1}{6}+\frac{1}{7}+\frac{1}{8}+\frac{1}{9}....\frac{1}{29} =\frac{N}{29!}\)
Find the remainder when N is divided by 19.
GATE CE
Divisibility and Remainder
View Solution
What will be the relative density?
M = 0.5 percentage of air voids
γ
min
= 1.3 gm/cc
γ
max
= 1.8 gm/cc
GATE CE
Uplift pressure
View Solution
Find RL of R?
RL of P [BM = 200.000
Point
Staff Readings
Back side
Staff Readings
Fore side
Remarks
P
-2.050
-
200.000
Q
1.050
0.95
Change Point
R
-
-1.655
-
GATE CE
Construction Management
View Solution
What will the angle of the failure plane from horizontal for sand be?
σ
3
=300
σ
1
=300+100=400
GATE CE
Seepage through soils
View Solution
Which of the following having negative skamptam Pore water coefficient?
GATE CE
Channel Hydraulics
View Solution
View More Questions