A trapezoidal canal lined with cement concrete (\(n = 0.01\)) is designed to carry a discharge of 20 m\(^3\)/s at a bed slope 1 in 400.
The bed width is twice the depth of flow and side slope of the canal section is 2 (1 vertical : 2 horizontal).
The corresponding depth of flow will be ............. (in m, rounded off to two decimal places).