In the Two-Envelope System for bids, the technical bid is opened first. The technical evaluation is done to check whether the bidder meets the required technical specifications. Only after the technical bids are evaluated and accepted, the financial bids are opened. This helps to ensure that the financial evaluation is done only for technically qualified bidders. Therefore, the correct answer is (A).
Final Answer: Technical bid is opened first