To check the feasibility, we use the maximum draft formula in a rolling mill:
Maximum draft = (Roll radius × Coefficient of friction) / Plate thickness
Given that the initial thickness is 30 mm, the final thickness is 27 mm, and the coefficient of friction is 0.12:
Maximum draft = (500 × 0.12) / 30 = 2.6 mm
Since the required draft (3 mm) exceeds the maximum permissible draft (2.6 mm), the process is not feasible.