The figure shows the plot of a function over the interval [-4, 4]. Which one of the options given CORRECTLY identifies the function? 
With reference to the Economic Order Quantity (EOQ) model, which one of the options given is correct? 
Which one of the options given represents the feasible region of the linear programming model:
Maximize \(45X_1 + 60X_2\)
\(X_1 \le 45\)
\(X_2 \le 50\)
\(10X_1 + 10X_2 \ge 600\)
\(25X_1 + 5X_2 \le 750\) 
A coordinate measuring machine (CMM) is used to determine the distance between Surface SP and Surface SQ of an approximately cuboidal shaped part. Surface SP is declared as the datum as per the engineering drawing used for manufacturing this part. The CMM is used to measure four points P1, P2, P3, P4 on Surface SP, and four points Q1, Q2, Q3, Q4 on Surface SQ as shown. A regression procedure is used to fit the necessary planes. The distance between the two fitted planes is ............... mm. (Answer in integer) 
An optical flat is used to measure the height difference between a reference slip gauge A and a slip gauge B. Upon viewing via the optical flat using a monochromatic light of wavelength 0.5 \(\mu\)m, 12 fringes were observed over a length of 15 mm of gauge B. If the gauges are placed 45 mm apart, the height difference of the gauges is ............... \(\mu\)m. (Answer in integer) 